A One-Day FLIGHT Mono Install

#153055

This entire system — including powder coated center stringer, maple treads, and railing system — was installed in a single day. In just six weeks, we can go from a signed shop drawing to a shipment that’s ready to go. That’s the Viewrail advantage.

More about the Project

From the very start, this installation was characterized by one word: simple. The homeowner gave us one dimension: finished floor to finished floor. We took that and gave him shop drawings and samples. Once he signed off, the magic began.

The house was finished, so we had to be careful not to damage the fascia around the staircase during install. We stationed two people at the footer of the stringer and two at the header. They bolted the stringer into place, then we dropped the treads on the brackets and screwed them in using pre-drilled mounting holes. The components went in without as much as scratching the surrounding surfaces.

The railing install was just as simple. We used tread side mount posts on either end of the tread — keeping the steps wide open so guests can easily traverse the staircase. Paired with the slender lines of rod railing, the finished look is minimal, open, and fresh.

This project came together quickly and easily because everything in our factory is tightly managed. Precise computers drive top-of-the-line machinery, so each component arrives at the jobsite perfectly labeled, safely packaged, and prepared for installation..

This entire system — including powder coated center stringer, maple treads, and railing system — was installed in a single day. In just six weeks, we can go from a signed shop drawing to a shipment that’s ready to go. That’s the Viewrail advantage.

See more Floating Stairs